Project – Leightons Gorgon Infrastructure Tonnage – Approx. 20,000 Date – from 2011 and still ongoing Site – Barrow Island
The site is a very sensitive environment and there are a lot of environmental concerns to be addressed when sending product there. We have extremely tight quarantine measures that we have to adhere to in order to fulfil the contract, the end result of which is steel (bar, mesh etc) wrapped inside protective plastic . These containers are inspected by the client and then shipped to the remote site. |
![]() |